Creekview Elementary School Improvements
about this project
This project involved the replacement of the domestic water piping system for Creekview Elementary School. Replacement of a small water chiller with two (2) new chillers for optimal energy efficiency. This project also included connecting new electrical to an existing electrical panel.
RDFA’s role was to provide the Mechanical, Electrical, and Plumbing design for this project.
Notable engineering features of this Project: Lachinvar “Crest” boilers were utilized on the basis of design.
115,000 Square Feet
Estimated Construction Cost: $350,000